Contractor: PCL
Engineers: HOK, Stantec Architecture
Tons: 3,500
Square Footage: 578,000
Edmonton, Alberta
A tight jobsite and very fast schedule made this project a challenge. Fabrication was started early at SunSteel’s facility to stay ahead of the erector. Close shipping coordination was done to insure only needed materials were shipped to the jobsite as to not overflow the already cramped laydown areas. .