Mineta San Jose Airport Interim Facility

Contractor: Hensel Phelps
Engineer:Walter P. Moore & Associates, Inc
Tons: 338
Square Footage: 31,000

San Jose, CA

This 31,000 square foot interim expansion at Mineta San Jose International Airport adds five passenger gates and an additional ground-loaded gate. SunSteel supplied and installed 338 tons of structural steel as well as the metal deck and stair package. The structural frame included the use of SidePlate connections.

Aviation/Aerospace, Featured, West